Life-Safety Cost Analysis

The Johnsonite Permalight Photoluminescent System adds to your building "state of the art" safety evacuation systems at a relatively low cost. Johnsonite Safe-T-First System specialists will work with you to hold your costs to a minimum. Once the initial system is paid for, there is no ongoing energy cost, with only normal floor covering maintenance.

Life-safety costs are those associated with compliance to building regulations required by federal (OSHA), state, provencial and municipal laws to maintain and operate the facility. These include safety equipment, fire and egress requirements such as signage, exit doors and building alarm/strobes, mandated training, nurses, doctors and emergency medical technicians.

As you will see from these charts, the amount spent on life-safety costs is relatively small. The median facility spent $0.25 per rentable square foot. The figures are from the results from the survey of over 190 companies that participated in the 1997 IFMA Research Report #18.

$/RSF = Cost Per Rentable Square Foot
N = Number

PERCENTILE $/RSF
99 $1.63
95 $1.14
90 $0.66
75 $0.31
50 $0.11
25 $0.04
10 $0.02
5 $0.01
1 $0.003
Mean $0.25
INDUSTRY TYPE N $/RSF
Banking/Industrial 11 $0.31
Information Services 6 $0.16
Energy Utilities 13 $0.25
Health Care 5 $0.16
Insurance 10 $0.08
Professional Services 9 $0.07
Trades/Retail 9 $0.22
Motor Vehicles 13 $0.13
Chemicals 6 $0.19
Consumer Products 13 $0.16
Computers 38 $0.52
Energy/Mining 5 $0.21
Other Manufacturing 14 $0.15
Governmental 12 $0.15
Research 9 $0.47
Other Instution 5 $0.08
FACILITY USE N $/RSF
Headquarters 94 $0.30
Other Offices 29 $0.21
Factory/Plant 16 $0.45
Research 18 $0.37
Health Care 4 $0.10
Computer Center 4 $0.27
Education/Training 3 $0.05